What Should Be The Initial Step To Be Followed For Bathroom Renovation In West Vancouver?

Question

The first step in any bathroom renovation, partial or complete, is to remove the drywall and any existing fixtures. It’s not too difficult to gut the bathroom yourself, but follow these instructions to prevent any costly blunders during demolition. You must follow these steps for bathroom renovation in West Vancouver. To avoid unpleasant spills, start by turning off the water, draining, and removing the toilet. If you plan to remove the bathtub, cover it first before starting to remove the bathroom tile until you reach the studs. Modifying the plumbing to fit your new shower or tub design is necessary.

 

Remove the insulation from your walls as needed. Insulation shouldn’t be hit with a hammer. Instead, use a reciprocating saw to remove the panels. Remove the flooring, cabinets, mirror, vanity, and other elements you intend to replace. It’s better to remove the baseboards before removing tile flooring so that you may reinstall them after installing your new floor. If you don’t want to get involved in this laborious work, call JCX Construction. We will not only help you renovate your bathroom but will also assist you in full home renovation in North Vancouver. So, worry not and book a visit now.

 

For more information, please visit:https://jcxconstruction.ca/

 

0
General Physics jcxconstruction 2 years 0 Answers 184 views 0

Leave an answer

Browse